EXPRESS INTEREST
Confirm the likely rider and passenger numbers without paying or making a binding commitment.
SEP 2027Dates · documents · latest changes
One practical reference for what happens next, what each traveller will need, and what has changed in the plan.
Key dates
Only confirmed dates are presented as fixed. Operator deadlines remain clearly marked as TBC so nobody mistakes a planning target for a binding commitment.
Obtain a transparent written rider and passenger package, vehicle breakdown, inclusions and payment terms.
Confirm the viable rider and passenger mix only after the final written proposal is accepted.
The deposit amount, refund terms, payment stages and final-payment date must be confirmed in writing first.
Check passport validity, motorcycle licence, IDP eligibility, names and clear colour scans.
Follow the operator’s final sequence for the Chinese visa, Tibet permit and temporary licence documents.
Arrive in Kunming with a full buffer before licensing and the weekend closure.
Licence applications and the short English-language test for riders over 60.
Bike setup, equipment check, route briefing and final preparation.
Kunming to Lhasa, subject to final permits, operator confirmation and route conditions.
Traveller checklist
The final operator checklist remains authoritative. This working list helps riders and passengers prepare without applying too early.
Permit information reviewed 26 August 2026
Check validity against the operator’s final rule and ensure the booking name matches exactly.
Visa type, timing and supporting documents remain subject to the operator’s written instructions.
Arranged through the authorised operator; independent applications are not used for this trip.
Must remain current and show the appropriate motorcycle entitlement.
Carry it with the Australian licence; confirm the required convention and validity before applying.
Processed in Kunming before departure. Riders over 60 complete the required short test.
Must expressly suit motorcycle riding and the trip’s planned engine capacity, altitude and region.
Emergency contacts, medical information, insurer assistance number and policy details.
Keep clear colour scans securely online and available offline on the phone.
Planning log
This log records material planning changes—not every discussion—so the group can quickly see what is new.
A five-step next-actions path, reviewed dates, destination highlights and direct map searches have been added.
Interactive route, elevation and hotel tools, FAQs, communications, decision tracking and preparation pages are live.
Exact figures were removed while the rider and passenger package breakdown is challenged and reviewed.
Vehicle size, luggage capacity, fuel, tolls and the per-person passenger calculation remain open.
Named hotels are planning selections only; Zogang and Basu still require operator confirmation.