Open questions · working assumptions · next actions

Expedition status

A transparent view of what is settled enough for planning—and what still requires a written operator answer.

OPEN ITEMS7awaiting operator response
PLANNING BASIS3usable but not contractually final
LAST REVIEWED26 AUG2026 planning update

Decision control

What must be settled before anyone commits.

This tracker separates usable planning assumptions from matters still awaiting a written operator response. It will be updated as each question is answered.

01Commercial

Passenger pricing breakdown

Awaiting operator
What we need
An itemised separation of van/driver, accommodation, guide services, permits and included activities.
Why it matters
Required before passengers can assess whether the package represents fair value.
02Transport

Van size for six passengers

Awaiting operator
What we need
A direct comparison of the nine-seat and fifteen-seat options, allowing for rider luggage in the support vehicle.
Why it matters
Changes comfort, vehicle cost and the passenger price.
03Transport

Van fuel and toll treatment

Awaiting operator
What we need
Written confirmation of whether fuel and road tolls are included in the passenger quote or paid separately.
Why it matters
Prevents unexpected shared expenses during the expedition.
04Fleet

Final motorcycle allocation

Planning basis
What we need
Final models, quantities, condition standard, tyres, luggage, insurance and damage policy.
Why it matters
The current CFMoto 450MT/Kove 525X information remains provisional.
05Accommodation

Zogang and Basu hotels

Awaiting operator
What we need
Property names, locations, room standard and overnight elevations.
Why it matters
Completes the hotel plan and allows the high-altitude sequence to be checked.
06Commercial

Deposit and payment schedule

Awaiting operator
What we need
Deposit amount, due dates, balance timing, cancellation terms and refund conditions.
Why it matters
Nobody should commit funds without the complete written payment framework.
07Licensing

If a rider fails the licence test

Awaiting operator
What we need
Retest availability, timing, passenger-van alternative and the financial treatment if the licence cannot be obtained.
Why it matters
A key risk for riders required to complete the temporary-licence test.
08Contract

Final inclusions and exclusions

Awaiting operator
What we need
One binding schedule covering permits, tickets, meals, accommodation, vehicles, tolls, fuel, insurance and optional costs.
Why it matters
Allows the group to compare the final package on a like-for-like basis.
09Schedule

September arrival sequence

Planning basis
What we need
Final operator confirmation of the licence appointment, handover day and departure date.
Why it matters
The current plan remains: arrive by 8 September, licensing on 9 September and expedition preparation from 10 September.
10Support

Rider luggage in support vehicle

Planning basis
What we need
Final capacity and daily access arrangements once the group size is known.
Why it matters
This affects both motorcycle loading and the passenger-van size decision.

Next operator response

A useful answer must be itemised.

The next quote should show the rider package, passenger package, van/driver cost, rooming basis, vehicle choice and every separate expense clearly enough for the group to make an informed decision.

01

Receive the operator’s detailed written breakdown

02

Compare nine-seat and fifteen-seat van scenarios

03

Confirm contractual inclusions, exclusions and payment terms

04

Update the website and circulate the outcome in WhatsApp